Three-phase energy monitor with Ethernet and PoE

Electronic architecture for monitoring a three-phase system and exposing measurements to supervisory platforms.

Status: Documented design · Not yet calibrated or tested
PCB render of Three-phase energy monitor with Ethernet and PoE

Electrical and functional performance requires testing on physical hardware. No unmeasured results are presented as verified.

01 / Context

The problem

Combine three-phase measurement, digital processing, Ethernet and PoE power in one architecture while accounting for electrical hazards and calibration.

02 / Scope

Requirements and scope

  • ATM90E32AS three-phase metering front end.
  • ESP32-S3 embedded processing.
  • Ethernet link using LAN8720A PHY.
  • PoE interface with TPS2378.
  • Electrical domain separation and a safety verification strategy.
03 / System

System architecture

The system combines an electrical measurement domain, ESP32-S3 controller, RMII Ethernet interface and PoE supply subsystem. Inter-domain integration requires careful review of ground references, isolation barriers and electrical protection.

ControllerATM90E32AS
Interface / subsystemESP32-S3
Additional focusPoE
Current stageDocumented design · Not yet calibrated or tested
04 / Trade-offs

Engineering decisions

  • ATM90E32AS to centralize three-phase measurement functions.
  • ESP32-S3 for acquisition control and communications.
  • Ethernet and PoE to explore single-cable network connectivity.
  • Isolation, protection and clearance review before any mains-voltage testing.
05 / Test plan

Verification plan

Electrical and functional performance requires testing on physical hardware. No unmeasured results are presented as verified.
  • Audit electrical clearances, isolation, protection and applicable safety requirements before energizing.
  • Validate power and PoE under safe bench conditions.
  • Verify Ethernet link and digital acquisition.
  • Define calibration and compare against a reference instrument.
06 / Honest status

Outcome and limitations

The result is a design package for prototyping. Metrological accuracy, electrical safety, isolation, regulatory compliance and continuous operation remain unverified. It must not be connected to mains power without a competent safety review and appropriate test plan.

Safety: do not connect to mains voltage without an appropriate review and testing procedure.
07 / Open engineering

Public documentation

The repository contains published design materials for this project. Check its contents and license before reusing any files.